What should a replacement scope say before any work is booked?
It should name the planes being done, the materials by type, the unknowns listed above, the method for agreeing a change when an unknown turns out badly, and what record you receive at the end. Anything silent on the unknowns is a quote for a different roof.
The single most useful line in a replacement document is the one describing what happens if the boards are bad. It should say how the condition will be shown to you, how the additional work is agreed, and that nothing extra proceeds without that agreement. Replacement scopes without that line are where almost every dispute in this trade begins.
The second most useful line is the one about the joints. Chimneys, wall abutments, dormer cheeks and valleys should be listed individually, with whether the metal is being replaced or reused. Reused flashing on a new covering is the shortest route back to the leak you were trying to be rid of.
Which office decides what my replacement needs?
The building department of the town or city the house is in. Municipalities in this area do not all answer the question the same way, and this site does not state what any one of them requires.
NY does not issue a statewide roofing license, and home improvement contractor licensing is set locally rather than centrally. That means two things on a practical level. The requirement you need is the one your own municipality applies, and the place to confirm it is that municipality's building department, before work starts rather than during it.
Where the house is landmarked or inside a designated historic district, there is a second office in the conversation, and material changes may be reviewed separately from like-for-like work. That is covered in reroofing in a historic district, and the permit question itself is set out in do I need a permit to reroof in Ulster County.
Can new covering go over the old one?
Mechanically it can, and there are reasons it is sometimes done, but it costs you the one thing a replacement is for: knowledge of the deck. It also adds weight and leaves the old problem in place.
Going over an existing covering means nobody reads the boards, nobody sees the framing, and any soft sheathing is sealed in under a new surface that is now fastened into it. It also makes the next replacement a bigger job, because two coverings have to come off instead of one. On a roof that has been wet, that is a poor trade.
Whether it is allowed at all for a given house is a question for the local building department rather than a rule this site can state. What can be said plainly is that the version of the work with a known deck underneath is the version with no hidden variables left in it.
What moves a replacement up or down in price here?
The number of planes and their pitch, access for staging and for waste, how many coverings come off, how much sheathing has to be replaced, the number of chimneys and wall joints, the covering material chosen, and whether ventilation work is included. The price is confirmed on site after inspection and approved before work starts.
Pitch and access do more than material choice on many houses around here. A steep plane needs staging and slows every stage of the work; a roof that a truck cannot reach changes how material and waste move; a house sitting close to a neighbor's wall limits where anything can be set down. None of that shows in a square measurement.
The two variables with the widest range are layers and decking, which are exactly the two nobody can confirm from the ground. That is the reason a figure is given after the roof has been looked at properly, and the reason the scope should describe how a decking finding is handled rather than leaving it to the day.
What should I have in my hands when the work is finished?
A written specification of what was installed, photographs of the roof while it was open, a note of every board and joint that was replaced, and the paperwork from whichever office was involved.
That package is worth keeping for two reasons. It is the baseline against which any future leak gets diagnosed, and it is what a buyer's inspector will want to see. A roof with a documented deck and a documented set of joints is a materially easier house to sell than one with a new surface and no record.
It is also how the next person up there avoids re-learning your roof. Where a ventilation change was part of the work, note that too, because attic ventilation is the part of a replacement whose effects show up a winter later rather than on the day.