Can a historic district property change from shake or shingle to metal?
Sometimes, and the answer comes from the commission rather than from the roofer. The pattern in review records is that like-for-like replacement is treated as routine, while a change of material is the thing that gets looked at.
In the Village of New Paltz, the Historic Preservation Commission issues Certificates of Appropriateness for exterior changes to landmarked properties and to properties in the Huguenot Street Historic District. Its agendas list like-for-like roof replacements as authorized without a certificate, and record a proposal to replace cedar shakes with standing-seam metal on outbuildings going to review. That is the distinction in practice: the material, not the work.
The practical order is to ask the commission with jurisdiction what your property is and what your proposal counts as, before choosing a profile or a color. A proposal presented with the existing material documented and the replacement described plainly is a much shorter conversation than one that arrives as a fait accompli.
What has to happen to the deck before panels go on?
It has to be sound, dry, in plane and properly fixed down. Metal hides nothing: a dip that a thick shingle absorbed will read as a shadow across a panel.
On older buildings the deck is often plank rather than sheet, laid with gaps, and sometimes carrying the marks of two or three previous coverings. Boards that have gone soft at the eave or around a chimney are replaced, high nails are dealt with, and the plane is checked along the run as well as across it. Where the gaps are wide, overlaying the planks gives the panels a continuous surface.
This is also the only moment when the structure under the deck is visible. Rafter tails, the top of a wall plate and the framing around an old chimney opening are all worth a look while the roof is open, because the cost of attending to them then is a fraction of the cost of coming back.